![]() For more information, please contact Nicole Mancini at 56. Westbound Acacia Road will be detoured to Mockingbird Drive. Traffic Impact:Westbound Acacia Road between Highway A1A to ~100 LF west on Acacia Road, in Vero Beach, around-the-clock beginning at 9 a.m. For more information, please contact RafaelUreña at 77. 14, 1 of 2 lanes closed, for utility pole operations. Traffic Impact:Eastbound 17th Street between 6th Ave and Indian River Blvd, in Vero Beach, 9 a.m. For more information, please contact Rafael Ureña at 77. 1 between 61st Place and 57th Street, in Vero Beach, 9 a.m. 14, 1 of 2 lanes may be intermittently closed with possible lane shifts or flagging operations, for FP&L pole installation operations. Traffic Impact:Northbound and southbound SR A1A between Jingle Trail and McLarty Treasure Museum, in Vero Beach, 9 p.m. 14, 1 of 3 lanes closed, for utility pole operations. Traffic Impact:Northbound and southbound SR 5 between 21st Street SE and Grove Isle Circle, in Vero Beach, 9 a.m. 14, 1 of 2 lanes closed, for FP&L utility pole installation and wring operations. Traffic Impact:Northbound and southbound Indian River Boulevard between Royal Palm Boulevard and 20th Street, in Vero Beach, 9 a.m. Traffic Impact:Northbound and southbound Indian River Boulevard between Royal Palm Boulevard and 20th Street, in Vero Beach, 9 p.m. Traffic Impact:Northbound and southbound SR A1A between Beachcomber Lane and John Island Drive, in Vero Beach, 9 p.m. ![]() Traffic Impact:Northbound and southbound SR A1A between Beachcomber Lane and John Island Drive, in Vero Beach, 9 a.m. 14, 1 of 2 lanes closed with possible lane shifts, for FP&L pole installation operations. Traffic Impact:Northbound and southbound SR A1A between Sandpiper Lane and Jasmine Lane, in Vero Beach, 9 a.m. Traffic Impact:Northbound and southbound SR 5 between 12th Street and Grove Isle Circle, in Vero Beach, 9 a.m. Traffic Impact:(City of Vero Beach, Vero Beach, Indian River Shores, Sebastian, Wabasso, Wabasso Beach, Orchid Island, City of Fellsmere) VERO BEACH: MAINTENANCE, UTILITY, PERMIT & ADDITIONAL AGENCY PROJECTS INDIAN RIVER COUNTY For more information, please contact Community Outreach Specialist Samantha Kayser at 77. to 3:30 p.m., Monday through Friday, beginning Monday, Oct. One northbound lane of SR A1A between 17th Street and SR 60/Beachland Boulevard will be intermittently closed from 9 a.m. The northbound shoulder of SR A1A will be closed around-the-clock through Oct. State Road A1A and State Road 5/US 1 Roadway Improvements Project Project Development & Environment StudiesĬurrent Construction Lane Closures in Indian River County.SR A1A and SR 5/US 1 Roadway Improvements Project.State Road (SR) A1A North Causeway Over Intracoastal Waterway (ICWW) Bridge Replacement Project.Fork St Lucie River Bridges Rehabilitation Project State Road (SR) 9/I-95 Northbound and Southbound Off-Ramps at Gatlin Boulevard Roadway Improvements Project.SR 9/I-95 Northbound and Southbound Off-Ramps at Midway Road Improvements Project.SR A1A From NE Shore Village TER To SR-732/Jensen Beach Causeway.sr a1a from ne shore village ter to sr-732/jensen beach causeway.State Road (SR) 76/Kanner Highway Resurfacing Project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |